DigiNepal

Floods push back Siddhababa tunnel opening to mid-January

Floods push back Siddhababa tunnel opening to mid-January

Floods push back Siddhababa tunnel opening to mid-January

The Bhotekoshi and Kaligandaki floods disrupted the delivery of electrical and safety equipment, delaying plans to open the tunnel to traffic.

kathmandupost.com/national/2026/11/04/floods-push-back-siddhababa-tunnel-opening-to-mid-january

Open in DigiNepal →