DigiNepal

Flood destroys equipment, pushing back Siddhababa tunnel opening

Flood destroys equipment, pushing back Siddhababa tunnel opening

Flood destroys equipment, pushing back Siddhababa tunnel opening

Replacement electromechanical equipment must be brought through the Korala border, delaying the planned start of traffic by at least a month.

kathmandupost.com/province-no-5/2026/09/23/flood-destroys-equipment-pushing-back-siddhababa-tunnel-opening

Open in DigiNepal →