DigiNepal

Bailey bridge planned at flood-damaged Arughat crossing

Bailey bridge planned at flood-damaged Arughat crossing

Bailey bridge planned at flood-damaged Arughat crossing

A 22-metre section of the bridge was washed away by the Budhi Gandaki flood on Sunday, halting traffic between Gorkha and Dhading. Authorities aim to complete the temporary crossing within 10 days.

kathmandupost.com/national/2026/10/13/bailey-bridge-planned-at-flood-damaged-arughat-crossing

Open in DigiNepal →